I/O Resource Management with Exadata

作者: Maclean Liu , post on November 3rd, 2010 , English Version
【本站文章除注明转载外,均为本站原创编译】
转载请注明:文章转载自: Oracle Clinic – Maclean Liu的个人技术博客 [http://www.oracledatabase12g.com/]
本文标题: I/O Resource Management with Exadata
本文永久地址: http://www.oracledatabase12g.com/archives/io-resource-management-exadata.html

Agenda

  • Exadata Overview
  • I/O Scheduling Overview
  • I/O Resource Manager Concepts
  • Intra-Database IORM
  • Inter-Database IORM
  • Category IORM
  • Demo
  • Q&A

Exadata Architecture Breaks Data Bandwidth Bottleneck

  • Exadata has Bigger Pipes
    • InfiniBand interconnect transfers data 5x faster than Fibre Channel
  • Exadata has More Pipes
    • Modular storage “Cell” building blocks organized into Massively Parallel Grid
    • Bandwidth scales with capacity
  • Exadata Ships Less Data Through Pipes
    • Query processing is moved into storage to dramatically reduce data sent to servers while offloading server CPUs


© 2010, www.oracledatabase12g.com. 版权所有.文章允许转载,但必须以链接方式注明源地址,否则追究法律责任.

相关文章 | Related posts:

  1. Exadata and Database Machine 11.2
  2. Oracle Database 11g: Change Management Overview eStudy
  3. Extending Automatic Storage Management to Manage ALL Data Oracle Database 11g Release 2
  4. Teradata to Exadata Migration Methodology
  5. Oracle Exadata v2的价格
  6. 11g新特性SQL执行计划管理(SQL Plan Management) (1)
  7. RMAN Performance Tuning Using Buffer Memory Parameters
  8. How to Identify Resource Intensive SQL for Tuning
  9. Automatic PGA Memory Management
  10. My Opinion On Exadata V2

Leave a Reply

  

  

  

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>